End of Waiting Lists? Indian Railways to Quadruple 7 Major Corridors

Union Minister Ashwini Vaishnaw announces the quadrupling of seven major rail corridors to reduce train delays and add 1,000+ new trains.

Ravi Pandey7 November 20262 min read0 viewsIndia
End of Waiting Lists? Indian Railways to Quadruple 7 Major Corridors

In a massive move to eliminate chronic train delays and the dreaded long waiting lists, Union Minister for Railways Ashwini Vaishnaw has announced that Indian Railways is quadrupling seven major rail corridors across the country. This strategic expansion of trunk routes aims to provide a permanent solution to the congestion that has plagued the network due to the simultaneous surge in passenger travel and heavy freight movement.

Tackling the Congestion Crisis

Speaking at a press conference, Minister Vaishnaw revealed that the railway network is currently facing a period of peak congestion. A primary driver of this pressure is the massive movement of coal and other essential goods, which must share the same tracks as high-volume passenger trains.

While the government has already laid 36,000 kilometres of additional tracks over the last decade, the Minister emphasized that increasing capacity through new tracks remains the only viable long-term remedy. "Constructing new tracks and increasing capacity is crucial; this is the only way to provide a permanent solution," Vaishnaw stated.

The Blueprint: Connecting Economic Hubs

To create sustainable capacity, the government is prioritizing the "four-lining" of key national routes. This involves expanding existing double-track lines into four-track corridors to separate or better manage the flow of traffic.

The focus is centered on the Golden Quadrilateral and critical diagonal routes that link India's biggest economic engines. The seven corridors being quadrupled include:

  • The Golden Quadrilateral Links: Routes connecting Delhi, Kolkata, Chennai, and Mumbai.
  • The Diagonal Corridors:
    • Delhi to Chennai
    • Mumbai to Kolkata
    • Delhi to Guwahati

The Minister noted that the urgency of these projects is reflected in the Prime Minister's frequent approvals of new railway initiatives, often occurring in nearly every second or third cabinet meeting.

What This Means for Passengers

For the millions of commuters who struggle with ticket availability, this expansion promises a significant relief. According to Minister Vaishnaw, the completion of the four-lining projects will unlock the capacity to operate over 1,000 additional regular trains.

This surge in train frequency is expected to directly alleviate the pressure on reservation availability and drastically reduce the length of passenger waiting lists, making rail travel more accessible and predictable for the general public.

"Once this four-lining is complete, we will be able to run over 1,000 additional regular trains. This will significantly alleviate the pressure on waiting lists and reservation availability."
Follow Prime News on WhatsAppJoin channel →
Share:

Comments

Leave a comment